週次 |
日期 |
單元主題 |
第1週 |
2019/09/13 |
中秋節 停課一次 |
第2週 |
2019/09/20 |
Course introduction
Lab 01 Equipment introduction (I)
Lab 02 Equipment introduction (II)
Introduction to the content of the course and the rules on class
Introduction to breadboard, resistors and capacitors
Learn how to use DC Power Supply, Function Generators, Multimeter and Oscilloscopes
Wave and Sound
Voltage divider circuit
Measure internal resistance
LTSPICE flash class
|
第3週 |
2019/09/27 |
Lab 03 Passive filters
Introduction to capacitors,inductors and filters
RC circuit and RC time constant
Low-pass RC filter and band pass RLC filter
|
第4週 |
2019/10/04 |
Lab 04 The measurement of I-V curve of diode
The measurement of I-V curve of diode
Introduction to final project:
訊號自動控制裝置(Light Sensitive Alarm)
接收無線電波裝置(例如AM radio)
接收人體電波裝置(例如 Electrocardiograph)
|
第5週 |
2019/10/11 |
國慶日連假 停課一次 |
第6週 |
2019/10/18 |
Lab 05 Rectifier circuits
Bridge rectifiers _ Cell phone charger
(請帶手機USB充電線)
Transformers soldering
First report submission |
第7週 |
2019/10/25 |
Lab 06 The characteristics of BJT I-V curve and operating regions
The measurement of BJT I-V curve
Introduce transistor operating regions |
第8週 |
2019/11/01 |
Lab 07 BJT switch
BJT switch _ Emergency light
Final project plan submission |
第9週 |
2019/11/8 |
Lab 08 BJT amplifiers (I)
Q point
BJT CE amplifier |
第10週 |
2019/11/15 |
校慶放假 停課一次 |
第11週 |
2019/11/22 |
Lab 09 BJT amplifiers (II)
BJT CC amplifier
Second report submission |
第12週 |
2019/11/29 |
Lab 10 Amplifiers IC and negative feedback
Inverting/Non-inverting configuration
Revised final project plan submission |
第13週 |
2019/12/06 |
Lab 11 Instrumentation amplifiers
Basic thermocouple amplifier featuring INA126 instrumentation amplifier |
第14週 |
2019/12/13 |
Lab 12 Positive Feedback in Op Amp
Comparator and Schmitt trigger |
第15週 |
2019/12/20 |
Final project I
Third report submission |
第16週 |
2019/12/27 |
Final project II
Check point-1 submission |
第17週 |
2019/01/03 |
Final project III
Check point-2 submission |
第18週 |
2019/01/11 |
Demo
期末專題口頭報告:預計每人5分鐘(報告3分鐘 + Q&A 2分鐘)
Clean Laboratory
Final project report submission deadline is 1/17 |